Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Hamriyah Integrated Power Plant | Ground Engineering Company | Dutch Foundations

Hamriyah Integrated Power Plant (1800 MW)

PROJECT NAME :

Hamriyah Integrated Power Plant (1800 MW)

PROJECT Type:

Industrial / Power Plant

CLIENT :

Sharjah Electricity and Water Authority

CONTRACTOR :

Tecnicas Reunidas

LOCATION :

Hamriyah, Sharjah, UAE

COMPLETION DATE :

2019

Scope of work :

Enabling Works, Piling Works (2,539 Nos. CFA Piles), Soil Improvement

PROJECT DESCRIPTION :

The Project is Sharjah’s first large scale independent combined cycle power project under a BOOT (Build, Own, Operate and Transfer) scheme, with a plant capacity of approximately 1,800 megawatts within the Hamriyah Complex, situated adjacent to Hamriyah port in Sharjah, United Arab Emirates.

Power generation will be based on combined cycle technology with a total net capacity of approximately 1800 MW at Reference Site Conditions.