Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
The Bridges (Phase 1) | Dutch Foundations

The Bridges (Phase 1)

PROJECT NAME :

The Bridges (Phase 1)

PROJECT Type:

Residential Towers

Client / CONTRACTOR :

Aldar Properties PJSC

CONSULTANT :

AECOM Middle East Limited

LOCATION :

Reem Island, Abu Dhabi, UAE

COMPLETION DATE :

2018

Scope of work :

Piling works (521 nos. main piles), shoring works (secant piles)

PROJECT DESCRIPTION :

The project’s scope of work involves the construction of phase 1 of The Bridges development on Reem Island Sector No. RS2, Abu Dhabi. The project offering from smart studios to spacious 3-bedroom apartments. The development will also feature pop-up shops, a café, and outdoor fitness equipment to inspire the most dynamic lifestyles.

Right next door, residents can enjoy the capital’s newest urban park, with almost 99,409square meters (m2) of amenities and attractions.

DUTCH FOUNDATIONS

FOLLOW US —