Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Pile Caps and Capping Beams - Dutch Foundations

Pile Caps and Capping Beams

Pile caps connect groups of piles to distribute loads over the capped piles. Pile heads are stripped to expose the steel reinforcement to be projected into the pile cap. Steel reinforcement is placed at the desired location and a large concrete block is formed. Pile caps can assume a variety of shapes, but they are mostly rectangular or triangular.

DUTCH FOUNDATIONS

FOLLOW US —